AT Meydan Phase 2
Building 1 & 6

Delivering a secure, scalable ELV foundation for multi-building residential living.

Project Overview

AT Meydan Phase 2 – Building 1 & 6 is a multi-building residential development that required a robust, secure, and scalable ELV infrastructure to support day-to-day operations and resident safety.

The project demanded seamless coordination across multiple ELV systems while ensuring long-term reliability and ease of management.

The Challenge

Managing security, access, and communication across multiple residential buildings presents both operational and safety challenges. The client required an integrated ELV ecosystem that could:

  • Ensure consistent security standards across buildings
  • Enable smooth access control for residents, visitors, and service personnel
  • Provide reliable surveillance coverage across common and critical areas
  • Avoid operational complexity caused by fragmented systems and multiple vendors

Our Role

ELV Solutions was engaged as the end-to-end ELV partner, responsible for system integration and on-ground execution.

Our scope included:

  • Coordinating multiple ELV systems under a single, unified framework
  • Executing installations with minimal disruption to site activities
  • Ensuring seamless handover and long-term system reliability

Solution Delivered

ELV Solutions designed and implemented a fully integrated ELV infrastructure, including:

Security & Surveillance

  • CCTV systems for continuous monitoring

Access & Entry Management

  • Access Control Systems
  • Gate Barrier Systems

Resident Communication

  • Audio Intercom Systems

Infrastructure Backbone

  • Structured Cabling Systems

Each system was designed to operate cohesively, ensuring efficient monitoring, control, and future scalability.

Key Outcomes

  • Improved safety and security across residential buildings
  • Enhanced resident experience through reliable access and communication systems
  • Future-ready ELV infrastructure capable of supporting expansion
  • On-time delivery through coordinated multi-system execution
  • Reduced vendor dependency with a single ELV integration partner

Project Snapshot

  • Project: AT Meydan Phase 2 – Building 1 & 6
  • Project Type: Residential
  • Systems Delivered: Structured Cabling, CCTV, Access Control, Audio Intercom, Gate Barriers
  • Role: End-to-end ELV Partner & System Integrator